Ready to Get Started?
Let's discuss how Lockout/Tagout (LOTO) Compliance Verification can transform your operations.
Schedule a DemoEquipment locked out. Photo evidence captured. Work completed. Removal authorized. Restart cleared. All documented.
Equipment locked out. Photo evidence captured. Work completed. Removal authorized. Restart cleared. All documented. This solution is part of our Productivity domain and can be deployed in 2-4 weeks using our proven tech stack.
This solution is particularly suited for:
A technician locks out a conveyor, starts disassembly. Mid-job, an operator restarts it using an alternate breaker. The technician's hand gets caught. Amputation. Or worse: a chemical reactor gets restarted while someone's inside. Chemical burn. Respiratory failure. These aren't hypotheticals—LOTO incidents happen regularly, and they're completely preventable.
OSHA 29 CFR 1910.147 says all equipment with stored energy—hydraulic, pneumatic, electrical, mechanical springs, pressure vessels—must be locked out and tagged before maintenance. Written program, authorized personnel, documented isolation points, proof everything is de-energized. Sounds simple. But most facilities run paper permits with zero verification locks were actually applied. Lock keys sit in office drawers, so nobody knows what's locked. Multiple workers lock the same equipment with no central tracking of who locked what. Work finishes and locks come off without documented proof that energy sources stay isolated. Emergencies happen and LOTO gets bypassed entirely.
The financial hit is brutal: OSHA fines start at $10,000+ per violation and stack up fast. A serious injury costs $500,000+ in workers' comp. Wrongful death settlements hit $2-5 million. Insurance premiums jump 15-40%. After a serious incident, OSHA audits your entire facility, finding more violations and keeping you shut down for weeks. Customers pull contracts when LOTO fails. For utilities, it can mean license suspension.
Your current paper-based approach leaves you exposed.
Digital permits replace paper forms. Technician requests a LOTO permit through mobile app. System checks: Is this person trained and certified for this equipment? Training current? If not, permit blocked. If yes, system displays the exact isolation points (main breaker, hydraulic relief valve, pneumatic isolator, whatever applies to this equipment). Technician scans the equipment QR code—creates a linkage showing which equipment, which technician, timestamp.
For each isolation point, technician: closes the valve/breaker, applies the physical lock, scans the lock's barcode/QR code on the app, takes a photo of the locked isolation point with the app. System records lock serial number, time, technician ID, equipment ID, and attaches the photo. System won't release lock keys from the controlled cage until all required isolation points are locked and verified. Prevents incomplete lockout.
High-risk equipment (multiple energy sources, fatal restart risk)? System requires multi-level sign-off. Technician locks. Supervisor approves the permit. Independent second technician physically verifies each lock is actually there—not assumed, actually seen. Only then work proceeds.
After maintenance, technician removes each lock, photographs proof of removal, documents equipment restart test: "Conveyor started OK, guards installed, running normal speed." Lock-by-lock photographic evidence. Supervisor and technician sign electronically. Complete history archived.
OSHA audit arrives? One-click report shows permits issued, photo evidence of lock placement/removal, training status of everyone certified, incident history, trends. No gaps. No scrambling for paper records.
Emergency restart needed? Only facility manager plus original technician can authorize it together. System logs it separately from normal closures, flagging excessive emergency restarts as a scheduling problem.
Digital LOTO compliance workflow from permit request through training authorization verification, multi-point energy isolation with photographic evidence, supervisory approval for Medium/High-hazard equipment, independent technical verification for High-risk equipment, equipment restart verification, and complete audit trail archival for regulatory compliance.
All solutions run on the IoTReady Operations Traceability Platform (OTP), designed to handle millions of data points per day with sub-second querying. The platform combines an integrated OLTP + OLAP database architecture for real-time transaction processing and powerful analytics.
Deployment options include on-premise installation, deployment on your cloud (AWS, Azure, GCP), or fully managed IoTReady-hosted solutions. All deployment models include identical enterprise features.
OTP includes built-in backup and restore, AI-powered assistance for data analysis and anomaly detection, integrated business intelligence dashboards, and spreadsheet-style data exploration. Role-based access control ensures appropriate information visibility across your organization.
2-4 week implementation with our proven tech stack. Get up and running quickly with minimal disruption.
Deploy on your servers with Docker containers. You own all your data with perpetual license - no vendor lock-in.
Incident reported on mobile. OSHA 300 log auto-generated. Corrective actions tracked to closure.
Operator scans badge at station. Not certified? Red light. No work on equipment they're not trained for.
Security breach. Incident logged. Investigation tracked. Root cause documented. Recurrence prevented.
Let's discuss how Lockout/Tagout (LOTO) Compliance Verification can transform your operations.
Schedule a Demo