Ready to Make Your Operations Traceable?
Let's discuss which solutions fit your needs
From BigBasket warehouses to Vedanta smelters. Deploy in 2-4 weeks.
Showing 131 solutions
BigBasket knows exactly what's in every warehouse, every minute. No surprises at month-end. That's real-time inventory—not yesterday's Excel.
Vedanta tracks every asset across facilities. Depreciation, maintenance history, utilization—one dashboard.
Chennai Silks tracks every garment across every workstation. Bottleneck at Station 4? Visible in real-time.
Flipkart monitors temperature across 100s of warehouses. 2 AM excursion? Alert fires before the spoilage.
First-pass yield dropped 3% last shift. You see it now, not next week. Fix it before it compounds.
Go Desi knows exactly which farmer's produce went into which snack packet. FSSAI auditor asks? Answer in seconds.
Weigh, label, pack—25-30 per minute. No manual entry. No mislabelled products. No customer complaints.
PM due in 3 days. Technician gets the checklist. Photos captured. Parts logged. No missed maintenance, no surprise breakdowns.
Vibration and temperature sensors on critical equipment. Issues detected weeks before failure. Downtime eliminated.
BigBasket scans crate, weighs it, gets green light. GRN auto-generated. Farmer paid instantly. No disputes.
Asset moved from Building A to Building C. Who approved? When? System knows. Audit trail complete.
Every change logged. Every user action timestamped. SOX auditor asks "who changed this?" You show them in seconds.
Batch number encodes plant, line, date, shift. Decode any batch instantly. Genealogy one scan away.
Recall hits. Within hours—not weeks—you know exactly which batches shipped where. FDA notification? Already generated.
Bearing temperature up 12°C from baseline. Alert fires. You replace it during scheduled downtime, not emergency.
System says Bin A-7. Reality says Bin C-12. One scan finds the truth—and the misplacer.
Receiver counts 97 units. PO says 100. Variance flagged instantly. Systematic short-shipments exposed.
Carrier X: 12% damage rate. Carrier Y: 2%. Same lane, same product. Carrier switch justified.
Certificate of Analysis arrives. OCR reads it. Values extracted. Spec validated. Material released—or quarantined.
Engineering changed the spec. Production used the old one. That mismatch? Eliminated. Change orders enforced at the station.
Chemical exposure logged. Duration recorded. Medical monitoring scheduled. Long-term health tracked.
Particle count spikes in ISO 7 cleanroom. Alert fires. You investigate before contamination hits the batch.
Role requires 4 competencies. Employee has 3. Gap flagged. Training assigned. No unqualified assignments.
Oil in compressed air. Contaminated product. Or: regular testing, trending, early alert. You choose.
Confined space entry permit. Atmospheric monitoring verified. Rescuer assigned. Supervisor authorized. All digital.
Cutting oil consumption up 40% on Line 3. Leak? Overuse? Now you investigate with data.
Production line stops. Everyone scrambles. Turns out a ₹50 part with 8-week lead time ran out. Never again.
Inbound truck arrives at 9 AM. By 10 AM, everything's on outbound trucks—nothing lost, nothing misallocated.
Customer returns product. RMA created. Evaluation routed. Warranty checked. Repair or replace—decision documented.
Customer X wants 100% inspection. Customer Y accepts AQL. System knows which rules apply to which order.
Damaged shipment arrives. Photo taken. Supplier notified. Claim filed. Damage rate by supplier: now visible.
21 CFR Part 11 audit. Every data change, every user action, every timestamp—immutable, auditable, compliant.
Three operators logged "surface defect" differently. System groups them automatically—same root cause, now visible.
15 deliveries, 3 drivers, optimal routes. Customer gets ETA. Driver gets directions. Last-mile solved.
SOP updated. Old version archived. Training triggered. Change history preserved. FDA auditor satisfied.
Engineering released Rev C. Production floor still using Rev B. That mismatch? Eliminated at the work order level.
Temperature, humidity, pressure—all monitored, all logged, all ready for the auditor.
Air quality report due in 12 days. Calendar shows it. You submit on time. No violations, no fines.
Line 4 down 23 hours last month. Main cause: hydraulic failures. Pareto chart shows it. Now fix the root cause.
Calendar says PM in 30 days. Runtime says PM needed now. Actual usage drives maintenance, not guesswork.
Every serial number, installation date, location history, maintenance record—one registry, complete genealogy.
CNC machine warranty expires in 45 days. Alert fires. You file that pending claim before coverage lapses.
Vedanta's shop floor syncs to SAP automatically. No duplicate entry. No data lag. No lies in the ERP.
Expired product shipped to customer. Recall. Brand damage. Or: system blocks it before picking. Your choice.
483 observation received. Response drafted. Management approved. Implementation tracked. Resolution documented.
Technician dispatched. Work order on mobile. Parts in van. Customer signature captured. Job closed.
Aerospace customer asks for AS9102 forms. You generate them in minutes—balloon drawings, dimensions, sign-offs, all digital.
Some operators hit 98% FPY. Others hover at 89%. Now you know who needs coaching—and who deserves recognition.
Vehicle #7 due for service. Driver assignment logged. Fuel consumption tracked. Fleet runs smooth.
Shipment arrives damaged. Photos documented. Carrier notified. Claim filed. ₹4.2L recovered last quarter.
Visitor arrives. Badge printed. Safety briefing completed. NDA signed. Host notified. Evacuation list updated.
Every hazmat container tracked. SDS accessible in one tap. Emergency response? Data ready.
₹50L testing equipment leaves the geofence. Alert fires. Security responds. Theft prevented.
Material under quality hold. Warehouse tries to ship it. System blocks. No exceptions without QA sign-off.
Humidity crept up 8% last week. Your defect rate crept up too. Now you see the correlation.
Hydraulic fluid due for change. Contamination test results logged. Fluid compatibility verified. Press runs smooth.
Part can't move to next station until inspection checkpoint is signed off. No shortcuts, no skipped steps.
Security breach. Incident logged. Investigation tracked. Root cause documented. Recurrence prevented.
Hot spot on electrical panel. 15°C above baseline. Fix it during planned downtime, not after the fire.
Q2 internal audit for Line 4. Scheduled. Completed. Findings tracked. Corrective actions closed. All documented.
International shipment. HS codes assigned. Export docs generated. Customs clears in hours, not days.
Vedanta's CFO sees inventory across facilities in real-time. PI/PV that took days now takes hours—and the numbers actually match.
Laptop assigned to whom? Warranty expiring when? License count accurate? One system, all answers.
Sun Pharma tracks every sample from receipt to certificate of analysis. Chain of custody, 21 CFR Part 11 compliant—no paper trail to reconstruct.
Driver delivers. Photo taken. Signature captured. Customer claims non-delivery? Evidence says otherwise.
Visual inspection station at 450 lux. Spec says 750. Defects slip through. Now you catch the gap.
Equipment locked out. Photo evidence captured. Work completed. Removal authorized. Restart cleared. All documented.
Bulk tank contains material from 4 suppliers. When a quality issue hits, you trace back to the exact source lot.
FDA asks: "Which raw materials went into Lot #4521?" You answer in seconds. Forward trace, backward trace—complete genealogy.
Motor overheating. Work order created, assigned, tracked—from report to repair to close-out.
Finished product batch #4521. Which raw material lots went into it? Full genealogy, one query.
Adhesive expires in 3 days. System quarantines it. No expired material in your finished goods.
Gauge R&R failed last month. That gauge is now blocked from use until recalibrated. No bad measurements in production.
Injection mold at 95,000 shots. Maintenance due at 100,000. Alert fires. You schedule PM before quality degrades.
Motor current pattern changed. Winding fault developing. You catch it weeks before the motor burns out.
Near-miss reported. Trend analysis shows 4 similar incidents this quarter. You fix the hazard before someone gets hurt.
Defect spotted. Photo snapped. Barcode scanned. NCR filed—all before the part leaves the station.
That inventory sitting untouched for 14 months? It's costing you ₹2.3L in holding costs. Now you'll know.
Particle count trending up over 4 samples. Bearing wear developing. You catch it before catastrophic failure.
Operator scans badge at station. Not certified? Red light. No work on equipment they're not trained for.
Order received at 2 PM. Picked, packed, shipped by 4 PM. Customer portal shows status. No "where's my order?" calls.
Incident reported on mobile. OSHA 300 log auto-generated. Corrective actions tracked to closure.
Step 3 can't happen until Step 2 is signed off. Aerospace-grade process control, enforced digitally.
Seal broken. Temperature indicator triggered. Cold chain compromised. Shipment rejected at receipt—not after use.
Pallet configured: 48 cases, 3 SKUs, 847 kg. Scanned at shipping. Configuration mismatch? Blocked before loading.
RFID card tapped. Gate opens. Spot allocated. Occupancy tracked. No tickets, no attendants, no chaos.
"PM completed" isn't enough. Show the photo. Compare to last month. Spot degradation before it's failure.
Worker enters hazard zone. PPE training not current. Entry blocked until training completed.
Cleanroom pressure differential drifts. Classification compromised. You know before the auditor does.
Prototype, pilot, production, sunset—each stage has different rules. System enforces them automatically.
Line 2 running at 78% of theoretical capacity. Line 5 at 94%. The bottleneck is obvious. Now fix it.
Work order on the floor. Every scan, every material pull, every labour minute—captured automatically, pushed to SAP.
Requisition to receipt, one workflow. Approvals routed. Supplier catalog managed. ERP synced.
CoA arrives as PDF. OCR extracts test results. System validates against PO spec. Material released or quarantined—automatically.
Incoming material. Inspection plan loaded. Measurements captured on mobile. Supplier scorecard updated automatically.
FDA published new guidance last month. Your log shows when you updated processes in response. Compliance documented.
Material rejected. Photos, test data, liability classification—all documented. Supplier dispute? You have the evidence.
2,000 pallets at customer sites. 847 overdue for return. Aging report shows which customers to call.
Return received. Inspected. Restocked, refurbished, or disposed—each path tracked, costs allocated.
Part failed inspection. Rework order created. Root cause linked. Cost tracked. Re-inspection passed. All documented.
Safety culture score dropped. Action items assigned. Changes implemented. Next quarter's score improved. Correlation proven.
Standardized severity scores. OSHA classification automated. Incident trends visible. Safety budget justified.
Customer scans product tag. Video plays. Product story, features, demo—right there in the showroom.
₹8.2L in scrap last month. Which defect codes? Which lines? Which shifts? Now you see—and act.
Diwali rush coming. Is your inventory ready—or will you be scrambling in October? Now you plan with data.
Every serial number, every product, every location—one registry. Counterfeit shows up? You spot it instantly.
Defective unit in the field. Trace back to the exact shift, line, and operator who built it—in seconds.
Operator sets up the machine. Takes photo. System validates against spec. Mismatch? Red light. No production until corrected.
Order picked. Carrier selected. Tracking live. Customer notified. On-time delivery: 94% and climbing.
Pharma shipment arrives. Temperature logger shows it held spec for 72 hours. Compliance documented, product released.
Pump failed again. Which spare part was installed last time? Same supplier? Same batch? Now you know.
Process drifting toward upper control limit. Alert fires. You adjust before a single out-of-spec part is made.
Picker reaches for the newer lot. Red light. Pick the older one first. Green light. FIFO enforced at the point of pick.
Part sent to subcontractor. Returned 3 weeks later. Was it inspected? Reworked? Every step documented.
Supplier's ISO certificate expired last month. Material blocked until updated certificate uploaded.
Supplier's defect PPM crept from 200 to 800 over 6 months. You saw it at 400. They didn't become a problem.
Supplier A: 98% on-time, 120 PPM defects. Supplier B: 87% on-time, 890 PPM. Contract renewal decision made easy.
₹12L in tools went missing last year. Which ones? Where? This year, you'll know—and recover them.
Caliper due for recalibration tomorrow. System alerts. Technician acts. ISO auditor happy.
Cutting tool checked out Tuesday. Not returned. System alerts. Tool recovered. ₹15,000 not written off.
Auditor asks: "Was this operator trained before assignment?" You show the date-stamped record. Question answered.
₹18L per year leaking from compressed air lines. Ultrasonic sensors find them. ROI in months.
Truck at 48,000 km. Service due at 50,000. Alert fires. You schedule before breakdown on highway.
Vibration baseline: 2.1 mm/s. Today: 4.8 mm/s. Motor bearing failing. You schedule replacement.
Product warranty expires in 30 days. Customer notified. Extended warranty offered. Revenue protected.
Hazardous waste in the general bin? Non-compliance. Now every waste stream is tracked, segregated, documented.
Labour cost per unit: ₹47 on Day Shift, ₹63 on Night Shift. Now you know where efficiency leaks.
₹40L in semi-finished goods sitting between stations. Now you see exactly where and why.
Paper forms? Gone. Everything's captured on mobile. Operations team sees it instantly. Managers see trends daily.
Line 3, Shift B, Operator #47—that's where your scrap costs are hiding. Now you see the pattern.
Know who's where, what's where, and whether every zone meets compliance—without walking the floor.
Let's discuss which solutions fit your needs