Free tool
Returnable asset calculator
Put in your fleet, your loss rate and what a crate costs. See what the ones that never come back cost you a year, and how long a gate reader and a few thousand tags take to pay for themselves.
Work out what the losses cost
Lost every year today
-
Payback
-
Rough figures on example defaults. None of them is a quote.
- Tags, once
- Gate readers, once
- Setup, once
- Paid once
- Crates no longer lost, every year
- Remakes avoided, every year
- Software and replacement tags, every year
- Net, every year
How it works
What it works out
The loss. Crates, bins and pallets that went out to a customer or a supplier and didn’t come back, times what a new one costs. That’s what you spend every year to keep the fleet the size it was.
The start. A tag on every returnable, an on-metal tag on every die, mould or steel bin, a reader at the gate, and the work of tying gate reads to challans. All of it is paid once. Software and the tags on replacement crates are paid every year.
The payback. What a running balance per customer stops you losing, plus the remakes you avoid when you know which vendor has the mould, less the yearly costs. The one-off spend divided by that is the payback. The calculator also shows the sum for crates alone, because the moulds can carry a payback that the crates can’t.
What it assumes
Every default is an example. Replace them with yours, starting with the loss rate, since everything else hangs off it.
What has a source: a UHF label at ₹5 to ₹8 and an on-metal tag at about ₹60, from Indian marketplace listings, and ₹2.5 lakh for a gate’s reader, antennas and cabling, which is the same figure as one dock door in our RFID ROI calculator: an Impinj R700 at US list, four antennas, mounts and cable.
What doesn’t: the fleet size, the crate price, the 10% loss rate, the 60% of losses a balance stops, how many moulds you tag, how often one goes missing, what a remake costs, the setup and the software. Those are numbers we made up to show the shape of the sum.
A crate that goes through a washer every trip may need a rugged tag, which costs more than a label. A gate four metres wide with an antenna on each side is well inside the five metres you can plan for on a real floor, but a truck parked across it isn’t. Read the gate with the vehicles that actually use it before you trust the balance.
Nothing is discounted, and the savings start in month one. A real rollout takes a few weeks to tag the fleet.